Cedar siding should be securely nailed to framing members furring members or to blocking between framing members.
Cedar shake siding installation guide.
L snap a level chalk line from this point across the wall and repeat the procedure around the entire house.
Lumber sizes and spacing for blocking and furring are shown in table 4.
1 for windows vinyl siding and metal accessories.
For optimal performance and appearance and to benefit from all the advantages the maibec warranty has to offer maibec siding must be installed with great care.
Solid sheathing is recommended for shakes and may be required in seismic regions or under treated shakes and shingles.
L determine the lowest point on the wall you will be siding.
Measure up 1 4 6 4mm less than the width of the starter strip to mark your chalk line.
Installation guide download for more than 75 years ply gem residential solutions has led the industry with a portfolio that is unmatched.
L using the chalk line as a guide install the top edge of the.
For information regarding the installation and maintenance of your cedar shake or shingle application visit our website for a complete list of resources.
Spaced sheathing is usually 1 x 4 or 1 x 6 softwood boards and shall not be less than 1 x 4 boards.
Attach the shake with a.
Shakes and shingles may be applied over spaced sheathing.
For example 16 inch long shingles should be installed with about 5 inch exposures.
Like all siding materials western red cedar performs best when installed properly on a suitable frame.
To achieve this the exposures should be slightly less than one third the length of the shingle.
Before installing siding make sure that flashings are installed to prevent moisture from entering wall and roof spaces.
Solid sheathing is used in areas with wind driven snow.
Eastern white cedar shingles before installing your maibec shingles carefully read the installation guide completely to understand the correct steps and precautions to take to ensure a proper installation.
Remodeler andrew grace gives background information on types of cedar shakes and the standards and installation details outlined by the cedar shake and shingle bureau before walking through the steps to replacing a cedar roof from laying courses of self adhered membrane felt and ventilation matrix to setting up the first row of starter shingles to fitting valleys and capping hips and ridges.
Align one of the vertical edges at the edge of the trim or corner of the wall.